How Your Score is Calculated

You are scored for each round of the simulation. If you score perfectly during all rounds, you will get a cumulative score of 100,000 for the entire simulation.

Three factors determine your score:

  • Delivery times. Shorter delivery times will improve your score. Shorter delivery times mean that your customers receive your products sooner.

  • Inventory carrying costs. Reducing your inventory will improve your score. Smaller inventories mean lower inventory carrying costs. Be careful, though. If your inventories are too low, you'll have a stock out and increase your delivery time.

  • Production leveling. Maintaining even productivity from period to period makes it easier to run your plants efficiently.

Credits


The Lean Manufacturing Simulation was developed for Oracle by Forio Business Simulations. The simulation runs using the Forio Broadcast 2.0 web simulation server.

Photo (Introduction): Licensed under Creative Commons Attribution 2.0 by whatknot.

The Lean Manufacturing Simulation is copyright © 2006, Oracle. All rights reserved.

Simulation Instructions

Each time period, follow these steps:

  1. Select the Customer, Distribution, and Production links on the left to review results for the current period.
  2. Select the Make Decisions link to implement new Lean initiatives with your limited capital budget of 100 credits per month.
  3. Submit Decisions and Advance the simulation to the next period and review the new results.
  4. Repeat steps 1 through 3 until the simulation is complete.

At the end of the simulation you'll receive a score, be able to enter a summary of your strategy and view the results from other users.